+9647708438062info@almaabco.com

Roads projects

Hai Al  Naseer in Al Najaf

  • The cost: 22  615 000 000
  • IRAQI    D
  • Date  :  25/ 6 /2013
  • Duration  : 660  day
  • DETAIL:
  1. Soil works with compacted
  2. Sub-base works  with compacted
  3. Curbs and Rain water channels
  4. Paving sidewalk
  5. Asphalt  works

Surroun the road in Najaf

  • The cost: 11 144 000 000
  • IRAQI    D
  • Date  :  25/ 6 /2013
  • Duration  : 240  day
  • DETAIL:
  1. Soil work with compacted
  2. Sub-base work with  compact
  3. Asphalt  works

Roads and sidewalks

  • Al ZOBAIDIA  PROJECT
  • The cost: 6 431 000 000
  • IRAQI    D
  • Date  :  15/ 6 /2011
  • Duration  : 450  day
  • DETAIL:
  1. Sewerage net works
  2. Water net  works
  3. Electric  net  works
  4. Communications net works
  5. Paving  the roads   works

Al Karada  project

  • In Bagdad
  • The cost: 7 395 000 000
  • IRAQI    D
  • Date  :  7/ 1 /2011
  • Duration  : 200  day
  • DETAIL:
  1. Soil work with compacted
  2. Sub-base works  with compacted
  3. Curbs and Rain water channels
  4. Paving sidewalk
  5. Asphalt  works

Al Hamedia  project

  • In Al sader city / bagdad
  • The cost: 2 462 000 000
  • IRAQI    D
  • Date  :  25/ 6 /2013
  • Duration  : 660  day
  • DETAIL:
  1. Soil works with compacted
  2. Sub-base works  with compacted
  3. Curbs and Rain water channels
  4. Paving sidewalk
  5. Asphalt  works

Blad Rose project

  • In Dialaa
  • The cost: 18 500 000 000
  • IRAQI    D
  • Date  :  12/ 8/2009
  • Duration  : 780  day
  • DETAIL:
  1. Civil  work
  2. Pipe works
  3. Electrical works 
  4. Mechanical works

Al Nahrawan project

  • In Bagdad
  • The cost: 4 300 000 000
  • IRAQI    D
  • Date  :  2/ 4/2010
  • Duration  : 300  day
  • DETAIL:
  1. Civil  work
  2. Pipe works
  3. Electrical works 
  4. Mechanical works

Al Wehda  project

  • In Bagdad
  • The cost: 1300 000 000
  • IRAQI    D
  • Date  :  17/ 8/2012
  • Duration  : 180 day
  • DETAIL:
  1. Civil  work
  2. Pipe works
  3. Electrical works 
  4. Mechanical works

Al Yousefia  project

  • In Bagdad
  • The cost: 900 000 000
  • IRAQI    D
  • Date  :  14/ 9/2013
  • Duration  : 120 day
  • DETAIL:
  1. Civil  work
  2. Pipe works
  3. Electrical works 
  4. Mechanical works

Sewage treatment plant

  • In Dialaa
  • The cost: 5 600 000 000
  • IRAQI    D
  • Date  :  21/ 2 /2009
  • Duration  : 220 day
  • DETAIL:
  1. Pre – casting  pile works

Hai Al Wehda project

  • In Bagdad
  • The cost: 1 600 000 000
  • IRAQI    D
  • Date  :  3/ 5/2013
  • Duration  : 200 day
  • DETAIL:
  1. Pipe lines net  works

Hai  Al Zehraa project

  • In Waset
  • The cost: 8 320 000 000
  • IRAQI    D
  • Date  :  16 / 3 / 2011
  • Duration  : 370  day
  • DETAIL:
  1. Pipe lines  net  works

Al Hussienia  project

  • In  Bagdad
  • The cost: 3 750 000 000
  • IRAQI    D
  • Date  :  23/ 8 /2012
  • Duration  : 230  day
  • DETAIL:
  1. Pipe line  net works
  2. Sub  station 

Al  Haferia project

  • In wast
  • The cost: 3 876 000 000
  • IRAQI    D
  • Date  :  15/2 /2013
  • Duration  : 310  day
  • DETAIL:
  1. Pipe line  net works
  2. Sub  station

Zayouna  project

  • In Baghdad
  • The cost: 7 320 000 000
  • IRAQI    D
  • Date  :  4/ 9 /2010
  • Duration  : 195 day
  • Cables  lines  works

Al Maimona 132 Kv substation project

  • In Maisan
  • The cost:5 450 000 000
  • IRAQI    D
  • Date  :  10/ 11 /2012
  • Duration  : 362 day
  • Pre – casting  pile
  • Civil works

Ali- Garbie  132 Kv substation   project

  • In Wast
  • The cost:4 350 000 000
  • IRAQI    D
  • Date  :  15/ 8 /2013
  • Duration  : 240 day
  • Civil works

Al- Gazali   132 Kv substation   project

  • In baghdad
  • The cost : 4 125  000 000
  • IRAQI    D
  • Date  :  15/ 5 /2016
  • Duration  : 200  day
  • Civil works
Close Menu